Excellent slitting line machine manufacturer factory: Heating of Cables, Motors, and Transformers: Poor power quality can lead to excessive heating in cables, motors, and transformer core cutting machine. This can accelerate the ageing of these components, shorten their lifespan, and potentially lead to catastrophic failures. Maintaining high power quality, including minimizing voltage unbalances, is critical for ensuring the efficient operation of electrical equipment and avoiding the potential negative consequences associated with poor power quality. In conclusion, maintaining high power quality is of paramount importance for the optimal performance and longevity of transformer equipment. High-quality power ensures efficient energy consumption, reduces operational costs, and extends the lifespan of the equipment. It also minimizes the risk of malfunctions, data corruption, and excessive heating of cables, motors, and transformers – issues often associated with poor power quality. See additional info at https://www.canwindg.com/products-detail-127763.

How to deal with the failure of the main transformer cooler? The failure of the main transformer cooler may cause the temperature of the main transformer to rise, thereby affecting the normal operation of the transformer. Therefore, if it is found that the main transformer cooler is faulty, it is necessary to take timely measures to deal with it. Here are some possible approaches: Replacing Faulty Cooler Parts: If some parts in your cooler are damaged or malfunctioning, consider replacing those parts to restore the cooler to working properly. The specific operation needs to be carried out according to the structure of the cooler and the cause of the failure. Clean the cooler: If the pipes or cooling fins in the cooler are clogged or dirt accumulates, it may reduce the cooling effect and affect the normal operation of the transformer. The way of cleaning can be used to remove the dirt and sundries inside the cooler to restore the normal operation of the cooler.

Rising temperature: The capacity of the transformer will decrease as the temperature rises. Therefore, it is necessary to consider the appropriate heat dissipation method and heat dissipation area when designing the transformer to ensure that the temperature rise of the transformer does not exceed the allowable range. Connection method: Different transformer connection methods, such as star, delta, etc., will also affect the capacity of the transformer. For the star connection, the capacity of the transformer can be increased by about 3 times; for the delta connection, the capacity of the transformer is relatively small. Insulation level: The insulation level of the transformer determines the insulation capability and safety performance of the transformer, and also affects the capacity of the transformer. To sum up, the capacity of the transformer is related to factors such as input voltage and output voltage, load nature, temperature rise, connection method and insulation level. When selecting a transformer, it is necessary to comprehensively consider various factors according to the actual situation to ensure the normal operation and stability of the transformer.

The company mainly produces 150 model oil-type transformercore shearing equipment below 1 600KVA, 300 model dry type transformer core shearing equipment below 6300KVA, 400 model special transformer core shearing equipment below 12500KVA and 600 model special transformer core shearing equipment below 63000KVA. 800 model extra transformer core shearing equipment, 1000 model extra transformer core shearing equipment, the type 1250 model CRGsilicon steel CNC slitting machine, and the dry type transformer core under 110KV automatic cutting and laminated processing center, oil transformer core automatic cutting robot automatic lamination processing center, reactor cutting center below 35Kv, 220KV high voltage transformer tc. CANWIN hire famous designer in Europe as our senior consultant, and germany Siemens as our strategic partner. The products have formed 5 series and more than 50 specifications.

The cut to length line is a special equipment for the production of transformer core, is our latest generation of cross shear line. This cut to length production line is used for shearing, O punching and V notch of transformer core sheet. The special point of this ctl line is that two O punch and one V notch can work at the same time to produce transformer core pieces with 3, 5, 7 steps in vertical direction and 3, 5, 7 steps in horizontal direction.

Three-dimensional wound core transformer breaks through the traditional triangle plane structure, adopts three-phase symmetric vertical structure, magnetic circuit completely symmetrical three-phase core products, magnetic resistance is greatly reduced, excitation current, no-load loss, is a kind of using traditional materials, but lower operating noise, structure is more compact and efficient energy-saving oil type transformer. Its excellent performance in energy saving and energy saving and environmental protection is in line with China’s energy conservation policy.

The transformer coils are referred to as the primary and secondary windings. When applying AC current to the primary winding of the transformer, the transformer coil creates a pulsing magnetic field. The core of the transformer works to direct the path of the magnetic field between the primary and secondary coils to prevent wasted energy.The machine is a very powerful and versatile machine which can wind a wide range of HV coils for distribution transformers using round and rectangular wires. It is fully automatic with paper strip winding.Winding material lnsulated with an epoxy resin -environmentally friendly.

The loss in magnetic flux in the transformer must therefore be minimized by providing a suitable mean between the primary and secondary windings. For this purpose, silicon steel magnetic cores are usually used. By using a core type transformer, magnetic losses are reduced and a greater amount of magnetic flux is conveyed between the primary and secondary coils, thereby increasing the transformer’s overall efficiency. Electrical materials play an important role in the field of engineering technology. Various technologies should be realized through certain equipment, and the equipment needs to be made of specific materials. Without corresponding materials, even technologies and products that are feasible in principle cannot be realized. The emergence of new materials can often bring significant technological progress. Discover even more info on https://www.canwindg.com/

Laser welding machine is an efficient and precise welding method using high energy density laser beam as a heat source. Laser welding is one of the important applications of laser material processing technology. It mainly used for welding thin wall material and low speed in the 1970 s. The welding process is thermal conduction, i.e. the laser radiation heating surface, the surface heat to the internal diffusion through heat conduction, by controlling the width of laser pulse, energy, peak power and repeating frequency, parameters such as melting of components, to form specific molten pool. Because of its unique advantages, it has been successfully used in precision welding of micro and small parts.As one of the best laser welding machine manufacturers in China, Canwin specialized in handheld laser welding machine and wholesale fiber laser welding machine making for over 20 years.

The main pillar of the smart grid is the smart substation, which is not only an important hub for power transmission and distribution, but also directly affects the operational and monitoring capabilities of the smart grid through its operational safety and stability. Through the network, information can be exchanged, and the transformer can share information with the process layer and the station control layer. On the premise of ensuring product performance, the integration of monitoring, control, measurement, protection, and metering is designed to achieve the integration of transformer components with actuators, sensors, and transformers.

Impedance voltage (%): Short-circuit the secondary winding of the transformer and slowly increase the voltage on the primary winding. When the short-circuit current of the secondary winding equals the rated value, the voltage applied on the primary side is the impedance voltage. It is usually expressed as a percentage of the rated voltage. Phase number and frequency: Three-phase is represented by S, and single-phase is represented by D. The frequency f of China’s national standard is 50Hz.There are countries abroad with 60Hz (such as the United States).I. Temperature rise and cooling: The difference between the temperature of the transformer winding or upper oil layer and the temperature of the surrounding environment is called the temperature rise of the winding or upper oil layer. The limit value of the temperature rise of the oil-immersed transformer winding is 65K, and the temperature rise of the oil surface is 55K.There are also various cooling methods: oil-immersed self-cooling, forced air cooling, water cooling, tube type, sheet type, etc.